Site Details: Loch Na Shibaidh Mhor

Clachan Hatchery
Loch Carnan, South Uist
Western Isles
HS8 5PD
Operator: Hebridean Smolts Ltd
Water type: Freshwater

Inspection reports

Case Number: 2021-0374


Download
Remote inspection done by , supervised by on 29/09/21.
The site has been used to stock S1 parr during the summer months in the past.
In 2021 it was stocked between June and August with the S0 parr now in Clachan Hatchery (FS0398).
There are no plans to stock the site in 2022 and the square wooden cages may be replaced.
Site inspected and confirmed fallow on 05/10/21 by and . [Original PDF]

Case Number: 2022-0468


Download
Site inspection and paper work conducted by , observed by .
No clinical signs of disease were observed during the physical inspection of the stock. So far morts have been low and the fish appear to be in good health. Highest weekly count for mortality this cycle was 480 which occurred due to predation from
Cormorants.
No treatments administered since input.
2 samples taken for VMD, sampled by . [Original PDF]

Case Number: 2022-0468


Download
Site inspection and paper work conducted by , observed by .
No clinical signs of disease were observed during the physical inspection of the stock. So far morts have been low and the fish appear to be in good health. Highest weekly count for mortality this cycle was 480 which occurred due to predation from
Cormorants.
No treatments administered since input.
2 samples taken for VMD, sampled by . [Original PDF]

Source