Site Details: Trenay
Water type: Seawater
Cumulative mortality over full production cycle
Production cycle end date: Jul 2018
Total losses: 32 %
Production cycle end date: Feb 2019
Total losses: 32.6 %
Inspection reports
Case Number: 2020-0284
Download
Site fallow since February 2019 with no plan to restock. Site to be inactivated at request of business, authorisation amendment form has been sent to business correspondent.
Site to be inspected as fallow when inspectorate visit other sites operated by the business later this year.
Mortalities over 1% since last inspection:
Wk34 (2018) - 5,276, 3.86%
Wk35 - 3,679, 2.8%
Wk36 - 1,479, 1.16%
Wk37 - 1,298, 1.03%
Wk38 - 1,275, 1.02%
Wk1 (2019) - 823, 1.93%
Wk2 - 587, 1.73%
Wk3 - 236, 1.18%
Wk4 - 331, 2.11%
Wk5 - 200, 1.64% [Original PDF]
Case Number: 2021-0205
Download
Movement records collected and site inspected as fallow. Cages have been removed from the site and all that remains are the mooring buoys which are expected to also be removed in the near future. Site to be inactivated. [Original PDF]