Site Details: North Voe
Lerwick
ZE1 0PX
Water type: Seawater
Cumulative mortality over full production cycle
North Voe Production cycle end date: Feb 2018
Total losses: 40.7 %
North Voe Production cycle end date: Jul 2019
Total losses: 12.7 %
North Voe Production cycle end date: Nov 2020
Total losses: 34.5 %
North Voe Production cycle end date: Jan 2023
Total losses: 32.6 %
Fish Health Inspectorate mortality
04/04/22-10/04/22
3,649
1.4%
11/04/22-17/04/22
3,282
1.20%
02/05/22-08/05/22
2,762
1.1%
13/06/22-19/06/22
4,229
1.70%
28/11/22-04/12/22
4,448
1.70%
12/12/22-18/12/22
3,606
1.90%
02/01/23-08/01/23
1,857
2.20%
09/01/23-15/01/23
628
1.40%
Inspection reports
Case Number: 2022-0041
Download
During the site inspection, fish were seen to be swimming deep and occasionally seen shoaling.
Fish at harvest are transferred off site through deadhaul.
Remote inspection conducted by on 01/03/2022 while shadowed by .
Site inspection confucted by on 08/03/2022 and supervised by .
VMD samples taken on 08/03/2022 by , and supervised by
Sampled fish were observed to be in good health and exhibited no clinical signs of disease. [Original PDF]